Washing Machines

6 Cylinder Commercial/Agricultural Final Block Washer, Peterborough, Cambridgeshire

Client: Varity Perkins Engines Limited

Date: 1995

Duration: 16 weeks from date of order

Modification works to the Pre Wash, Intermediate Wash and Final Block Wash requiring the design, manufacture and installation of new Ceramatic filtration systems to replace the existing filtration process.

 


 

4 Cylinder Commercial/Agricultural Block Washer, Peterborough, Cambridgeshire

Client: Varity Perkins Engines Limited

Date: 1992

Duration: 16 weeks from date of order

Refurbishment of existing 4 Cylinder Commercial/Agricultural Block Washer requiring the design, manufacture and installation of new transfer system prime movers, and new wash and blow-off tip ups and clamp arms. Refurbishment of the transfer system, included a new transfer bar, location pins, lift arms and associated bearings, cam followers and rest padsas well as new wash manifolds, pipework, pump and Ceramatic filter.

 


 

Crankshaft Washer, Bridgend, South Wales

Client: Ford Motor Company

Date: 1992

Duration: 16 weeks from date of order

Refurbishment of existing cam shaft washer unit requiring the design, manufacture and installation of a new fixturised washing system that incorporates a high-pressure back flushing system to ensure the maximum swarf removal from oil ways and galleries. Replacement of the machine transfer system, including new transfer bar, location pins, lift arms and associated bearings, cam followers and rest pads. Redesign of the Wash Machine filtration system to incorporating a high pressure pump and a PAL fine cartridge filtration system.

 


 

4 Cylinder Commercial/Agricultural Head Washer, Peterborough, Cambridgeshire

Client: Varity Perkins Engines Limited

Date: 1991

Duration: 16 weeks from date of order

Refurbishment of existing 4 Cylinder Commercial/Agricultural Head Washer requiring the design, manufacture and installation of a new transfer system, including new transfer bar, location pins, lift arms and associated bearings, cam followers and rest pads. Upgrade of index mechanism including overhaul of ferris wheel, replacement of clamp pads, clamp pins, cam followers and cam plates. The existing drag conveyors were also refurbished by replacing existing flight bars, chain and drive sprockets.